Call +44(0)1253 808049 for a Competitive Quote.

Budgetary Quote

Finance can be arranged on request to meet your monthly / quarterly budget.

When you receive quotes for Leased Lines, SDSL from BT, Telewest, NTL et al, don't forget to look at what you are spending over 3 years, 5 years, 10 years.

Wireless Link - 14Mbps - 5.8 GHz Frequency

Installation & Commissioning
To supply, configure, install, and test a 14 Mbps¹  Base and Remote Bridge radio system, including: Outdoor (ODU) and Indoor (IDU) units with lightning protection, all cables, connectors, all steelwork (channel brackets, N metre masts, and anchors).

¹ 7 Mbps upstream, and 7 Mbps downstream
£6,655.00
Maintenance
External Networks Customer Support includes Next Day Response, access to technical support via telephone and email and remote checking of link.
£600 per year
Licence
External Networks will apply and pay the first year fee for the sites to be licensed.
 
F.O.C.
 

Laser Link - 100Mbps - 500 metres

Installation & Commissioning
To supply, install, align and configure two 500 metre Free Space Optic units complete with single 100Mbps or 155Mbps, Multimode (optional Singlemode) fibre (1310nm) SC connector, or RJ45 connector and two AC/DC power supplies.
£13,868.00
Maintenance
External Networks Customer Support includes Next Day Response, access to technical support via telephone and email and remote checking of link.
£2062 per year

 

Laser Link - 1Gbps / 1000Mbps - 500 metres

Installation & Commissioning
To supply, install, align and configure two 500 metre Free Space Optic outdoor units (ODU), two indoor units (IDU) with dual network and client, complete with 1Gbps Ethernet, Singlemode or, Multimode fibre (1310nm) SC connectors ports, and four AC/DC power supplies.
£24,184.00
Maintenance
External Networks Customer Support includes Next Day Response, access to technical support via telephone and email and remote checking of link.
£2812 per year

 

Microwave Link - 311Mbps - from 1km to 20km

Installation & Commissioning
To supply, install, align and configure two ETSI 38 GHz outdoor units (ODU) with antennas, IDU chassis, IDC with with Ethernet wayside for STM1, IDM-311 Mbps - Gigabit Ethernet Optical interface. Plus all cables, connectors and steelworks as required for a standard point to point building to building link.

Does NOT include OfCom license fee. This will need to be individually priced.
£31,150.00
Maintenance
External Networks Customer Support includes Next Day Response, access to technical support via telephone and email and remote checking of link.
£3850 per year


Click here to arrange a free survey...

 

 

All quotation's are provided for budgetary purposes.

 


All final price's are subject to a site survey to confirm the line-of-sight positions, point-to-point distance, GPS readings, and access to suitable fixing positions, cable routes and termination points.
 


Should the installation require high access equipment e.g. a cherry picker, the costs will be borne by the client.

 

Payment Terms: pre-payment of 20% followed by remainder within 14 days of installation.
 


All prices are subject to VAT at 17.5%. This quotation is offered subject to our standard terms and conditions of sale.

 

Radio Link Lead time : 2 – 4 weeks from receipt of purchase order.
 


Laser Link Lead time : 3 – 6 weeks from receipt of purchase order.
 

 

We Supply Leased LineSDSL, ISDN and Alternative options such as a Laser Link, Wireless Link or a Microwave Link . We link building's delivering secure high bandwidth solutions for LAN's / WAN's.

Leased Line, SDSL, ISDN Alternatives using Microwave Links, Wireless Links and Laser Links